25%


Title Page

Ethics Statement and Signatures
Table of Contents
List of Figures
List of Tables
Abstract
Problem Statement
Motivation
Literature Survey
Project Objectives
Conceptual Design (Present Design Alternatives)
Proposed Design
Timeline for Spring and Fall. Gantt chart that includes major tasks 
and breakdown of responsibilities among team members indicating major and support roles for Fall and Spring semesters
Analytical Analysis
Major Components
Structural Design
Cost Analysis (In addition to the cost of prototype and actual system components, record hours spent on this project by each team 
member and report the total human hours spent. This will help the calculation of total actual engineering cost of the project. 
IAB wants this information collected and reported.)
Prototype System Description
Prototype Cost Analysis
Plan for Tests on Prototype
Conclusions
References
Appendices (Appendix A, Appendix B, Appendix C, etc.)